Tinny Pimp Floor Frame

The floor frame is well underway now and I’m really happy with the results. The layout I have decided to go with includes a bow and starboard casting platforms, level middle section with underfloor rod locker. The rod locker has been a lot more work and fiddly than expected as it extends under the front seat but I think it will be well worth it in the end.

Read about it here

Cheers

Matt

Floor plan 3

 

rod locker with sides

rod locker with sides

 

 

 

 

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s